Data Center Equipment Prefabricated Steel Building 10 kN Floor Load Sealed Envelope
Product Summary
An equipment building is a structure designed around concentrated loads. A row of server racks or a switchgear line puts 10 kN per square metre on the slab, and a single battery room can exceed that in one small area. This building uses a 8 m by 8 m column grid with a slab designed for 10 kN per ...
Product Custom Attributes
data center steel building
,equipment building structure
,sealed steel envelope building
Basic Properties
Trading Properties
Product Description
An equipment building is a structure designed around concentrated loads. A row of server racks or a switchgear line puts 10 kN per square metre on the slab, and a single battery room can exceed that in one small area. This building uses a 8 m by 8 m column grid with a slab designed for 10 kN per square metre general load and 20 kN in designated equipment zones, a sealed envelope with controlled humidity, and roof structure sized for the cooling units and cable trays that will arrive later. KXD Steel Structure builds these shells for operators who need the building ready before the equipment delivery date.
Load path discipline is what separates an equipment building from a warehouse. Equipment zones are marked on the structural drawing so the contractor reinforces the right areas rather than over designing the whole slab. Cable tray routes are carried on secondary steel independent of the roof purlins, and floor penetrations for power and fibre are pre formed with fire stop collars so sealing is straightforward after installation. Where batteries are present, the room is separated with a fire rated wall and the floor is coated with an acid resistant finish drained to a containment sump.
The envelope has to control humidity, not just temperature. A sealed building with a vapour barrier, minimal thermal bridging and pressure controlled ventilation keeps the dew point below the equipment surface temperature, which is the condition that actually prevents condensation on cold electronics. Roof and wall panels are 100 mm insulated with taped joints, and all penetrations are sealed with a tested system rather than mastic. Cooling units sit on a roof frame designed for their weight and vibration, with Service clearance and lifting routes marked on the layout so a replacement chiller can be landed without cutting the roof.
Key Features- 10 kN per square metre floor load: General equipment load with 20 kN zones at rack rows and switchgear
- Marked equipment zones: Reinforcement concentrated where the load actually goes
- Sealed insulated envelope: 100 mm panels with taped joints and tested penetration seals
- Independent cable tray steel: Trays carried clear of roof purlins for future capacity
- Fire rated battery room: Separated compartment with acid resistant drained floor
- Roof plant frame: Cooling unit supports sized for weight, vibration and replacement access
| Parameter | Specification |
|---|---|
| Floor load | 10 kN per square metre general, 20 kN in equipment zones |
| Grid | 8 m by 8 m with 6 m secondary beams |
| Envelope | 100 mm insulated panel, sealed joints, vapour barrier |
| Roof load | 1.5 kN per square metre for plant plus 0.5 kN services |
| Fire separation | 120 minute battery room wall |
| Floor finish | Sealed epoxy, acid resistant in battery areas |
| Cooling | Roof mounted units on isolated frames with lifting routes |
| Power entry | Pre formed penetrations with fire stop collars |
| Structure | Q355B frame, galvanized secondary steel |
Telecom and data centre shells, substation control buildings, manufacturing control rooms, laboratory equipment halls and cold chain monitoring facilities use this specification. It also suits any operation where equipment loads are high and the environment has to stay stable through the seasons. Where the operator plans phased rack installation, the power and cooling routes are sized for the final capacity so the building does not need structural work at each phase.
Engineering Notes and Quality ControlEquipment buildings are verified against the equipment schedule. Floor flatness is surveyed to FF35 or better because rack levelling depends on it, and equipment zone reinforcement is checked before the pour. Envelope airtightness is tested with a blower door and leakage is sealed and re tested rather than accepted. Fire stop installations are inspected and photographed at each penetration. Cooling frame vibration is measured after commissioning, and lifting routes are walked with the client's facilities team before handover.
Packaging, Loading and WarrantySteel ships as bundles by zone with equipment zone beams marked, panels are packed by elevation with joint sealant supplied per wall, and fire stop materials are boxed with installation instructions. Documentation includes the equipment zone plan, flatness survey, airtightness test report and fire stop register. Structural warranty is 10 years, envelope warranty 5 years. Send your equipment schedule, load map and cooling strategy for a layout and structural study.
Contact Our Experts And Get A Free Consultation!
Our mission is to offer "High Quality" & "Good Service" & "Fast Delivery" to help our clients to gain more profits.