Modern Prefabricated Steel Structure Building Metal Garages Warehouses Industrial Sheds
Resumen del producto
Edificios prefabricados de acero duraderos con una vida útil de 50 años, certificados según estándares globales (ISO, CE, SGS). Luces personalizadas de hasta 80 m, resistencia al viento/nieve y montaje rápido con pernos. Ideal para almacenes, fábricas y uso industrial.
Atributos personalizados del producto
Modern steel structure building
,Prefabricated steel structure building
,Industrial metal carport garage kits
Propiedades básicas
Propiedades comerciales
Descripción de producto
| Application | Storage, Workshop, Garage, Farm Shed, Logistics Station, Construction Site Office |
| Structure Type | Portal Frame / Multi-story / Truss Structure |
| Design Standard | GB (China), AISC (USA), Eurocode (EU), AS/NZS (Australia) - Customizable |
| Steel Material | Q235B, Q355B, Q345, ASTM A36, ASTM A572 Gr.50 |
| Span (Width) | 5m - 80m (Customized) |
| Length | Unlimited (Based on site) |
| Eave Height | 4m - 20m (Customized) |
| Crane Support | None, 5T, 10T, 20T, 50T+ |
| Wind Resistance | Up to 140 km/h (Customized per location) |
| Snow Load | Up to 1.5 kn/m² (Customized) |
| Surface Treatment | Sandblasting Sa2.5 + Epoxy Paint / Hot-dip Galvanized |
| Roof Slope | 5%, 10%, 15% (Recommended 10% for drainage) |
| Roof & Wall Sheets | Option A: Corrugated Steel Sheet (0.4mm - 0.6mm thickness) Option B: Sandwich Panel (EPS, Rock Wool, PU, Glass Wool) |
| Color Options | RAL Color Chart (Popular: White, Blue, Red, Grey, Green) |
| Panel Thickness | 50mm, 75mm, 100mm (For insulated options) |
| Main Door | Rolling Shutter Door (Electric/Manual), Sliding Door, Swing Door |
| Side/Personnel Door | Steel Security Door, Aluminum Alloy Door |
| Windows | PVC/Aluminum Sliding Windows, Louver Windows (for ventilation) |
| Certificate | ISO9001, CE, SGS Test Reports Available, C/O. |
| Supply Ability | 10000 Tons per Month |
| Delivery Time | 10-30 Days after drawing confirmation |
| Service Life | 50 years |
| Packing Method | Nude Packing for steel frames (bundled with steel strips) Stacked Packing for sheets/panels (protected by foam & cardboard) |
| Container Loading | Optimized loading plan to maximize space (e.g., 200-300 sqm fits in 1x40HQ) |
| Delivery Time | 15-25 Days after deposit and drawing confirmation |
| Installation Guide | Detailed PDF Drawings + Step-by-Step Video Tutorial Provided |
| On-site Support | Engineers available for overseas guidance (Extra cost) |

- Environmental friendly
- Low cost and maintenance
- Long using time up to 50 years
- Stable and earthquake resistance up to 9 grade
- Fast construction, time saving and labor saving
- Good appearance
- Easy assembly and disassembly several times without damage
- Snow load
- Wind load
- Seismic magnitude
- Middle Column allowed or not
- Project location
- Length (side wall, m)
- Width (end wall, m)
- Wall Height (eave, m)
- Mezzanine or not and usage
- Warehouse/Storage
- Factory
- Agriculture Barn
- Retail Store
- Repair/Mechanic Shop
- Office Space
- Medical Warehouse
- Animal Farm (please confirm what kind of animal)
- The processing of our heavy steel structure members strictly follows international standards such as AISC 360, Eurocode 3 and EN 1090, ensuring high quality and structural stability for overseas projects.
- Then, strict raw material inspection is carried out for the incoming steel plates and sections, including material certificate verification, size measurement and appearance inspection.
- Next, lofting, marking and cutting are performed by numerical control equipment to guarantee precise cutting dimensions.
- After that, straightening and correction (thermal or mechanical) are conducted to ensure the flatness of the components.
- Drilling and punching processes are then carried out to meet the assembly requirements, followed by the assembly and fitting-up of main components such as H-beams, columns, beams and supports.
- Professional welding (submerged arc welding, gas shielded welding) is implemented to ensure the firmness of the joints, and subsequent welding inspection (visual inspection and UT/MT non-destructive testing) is carried out to ensure welding quality.
- Secondary straightening and grinding are performed to correct deformation and remove burrs, and then shot blasting is conducted to reach Sa2.5 derusting grade, which enhances the adhesion of the coating.
- Finally, each component is marked clearly, packed properly and delivered from the factory, ensuring safe transportation and smooth on-site installation for our customers.
¡Contacta a nuestros expertos y obtén una consulta gratuita!
Nuestra misión es ofrecer "Alta Calidad", "Buen Servicio" y "Entrega Rápida" para ayudar a nuestros clientes a obtener mayores beneficios.