Indoor Swimming Pool Prefabricated Steel Building 36m Clear Span Natatorium Design
Product Summary
A swimming pool hall is the most aggressive environment a steel frame will ever face indoors. Warm humid air at 30 degrees with 60 percent relative humidity, plus chloramine vapour from the pool surface, attacks unprotected steel faster than a coastal site. This natatorium uses a 36 m clear span ...
Product Custom Attributes
natatorium steel building
,indoor pool steel structure
,chlorine resistant building
Basic Properties
Trading Properties
Product Description
A swimming pool hall is the most aggressive environment a steel frame will ever face indoors. Warm humid air at 30 degrees with 60 percent relative humidity, plus chloramine vapour from the pool surface, attacks unprotected steel faster than a coastal site. This natatorium uses a 36 m clear span frame with a high performance coating system, a vapour barrier on the warm side of the envelope, and dehumidification ductwork designed to keep the steel surface temperature above dew point. KXD Steel Structure builds pool halls with the mechanical engineer's air strategy in mind, because the coating alone does not solve a condensation problem.
The envelope strategy is what protects the steel. Wall and roof panels carry a continuous vapour barrier on the warm side and all fixings are stainless or coated, with a thermal break between the panel and the frame so no cold bridge forms. We specify a three coat system on exposed steel at 240 microns total dry film thickness, with a stripe coat on every weld and bolt head where coating failures begin. Where the architect wants exposed structure as a design feature, we use a galvanized frame with a top coat that can be inspected and repainted from a mobile platform, and we mark maintenance access routes on the drawings.
Acoustic control and air distribution shape the section. A 36 m span over a pool deck needs a shallow roof so the volume of humid air to condition stays manageable, which is why the frame uses a tapered rafter rather than a deep truss. Supply ducts run in the roof zone and discharge over the glazing to prevent condensation on cold glass, and the return is taken low along the pool side where chloramines concentrate. Glazing is specified as double glazed units with a warm edge spacer, and every opening window is interlocked with the dehumidifier control so the hall cannot be ventilated in a way that pulls moisture into the structure.
Key Features- 36 m clear span: Column free pool hall with tapered rafters to keep the conditioned volume low
- 240 micron coating system: Three coat protection with stripe coats at welds and fasteners
- Thermal break detailing: Isolating pads between panel and frame prevent cold bridges
- Vapour barrier on warm side: Continuous membrane stops moisture reaching the steel
- Dehumidification interface: Duct routing coordinated to keep steel above dew point
- Interlocked glazing control: Windows tied to the dehumidifier to avoid moisture ingress cycles
| Parameter | Specification |
|---|---|
| Clear span | 36 m, tapered rafter frame |
| Eave height | 8 m, ridge 12 m |
| Coating system | Three coat, 240 microns total dry film thickness |
| Wall and roof panel | 100 mm insulated panel with vapour barrier |
| Glazing | Double glazed units with warm edge spacer |
| Pool hall climate | 30 degrees Celsius at 60 percent relative humidity design basis |
| Structure steel | Q355B with thermal break pads at panel interfaces |
| Acoustic treatment | Perforated liner panels on the roof zone |
| Corrosion class | Category C5 equivalent protective system |
Municipal swimming centres, hotel and resort pools, school and university aquatic centres, rehabilitation therapy pools and private sports clubs use this structure. It also suits water park enclosures and spa facilities where humidity control is the governing design case. Where a client plans to add a learner pool later, the frame and the dehumidification capacity are sized for the final layout so the extension is a ductwork change rather than a structural one.
Engineering Notes and Quality ControlPool halls are commissioned around moisture. We inspect the vapour barrier before the internal lining closes it in and photograph every penetration. Coating thickness is measured at 20 points per bay with a magnetic gauge, and holiday testing is carried out on welds. After handover a dew point survey checks surface temperatures on the frame during a full occupancy session, and any reading within 2 degrees of dew point is treated as a defect in the air strategy rather than as acceptable. Records go into the operations manual.
Packaging, Loading and WarrantyFrames ship as matched bundles with coating protection at slings points, panels in edge racks with film on both faces, and glazing crated vertically. Stainless fixings are packed separately to avoid contact with carbon steel during shipping. Erection drawings include the coating repair procedure for site touch up. Structural warranty is 10 years, coating warranty 10 years with a documented inspection interval. Send your pool size, water area and mechanical strategy for a hall section and envelope specification.
Contact Our Experts And Get A Free Consultation!
Our mission is to offer "High Quality" & "Good Service" & "Fast Delivery" to help our clients to gain more profits.