A car park is a structure designed for a load that never sleeps: a 2.5 tonne vehicle can be parked anywhere on the deck, so every square metre has to carry it. This five level prefabricated car park provides 800 spaces on a Q355B frame with composite decks, a 6 m structural grid to suit a three bay ...
Product Custom Attributes
multi storey car parking
,steel car park structure
,prefabricated parking building
Basic Properties
Trading Properties
Product Description
A car park is a structure designed for a load that never sleeps: a 2.5 tonne vehicle can be parked anywhere on the deck, so every square metre has to carry it. This five level prefabricated car park provides 800 spaces on a Q355B frame with composite decks, a 6 m structural grid to suit a three bay parking module, and two way ramps at 1:7 gradient. KXD Steel Structure designs car parks for developers and institutions where the programme matters, because a steel frame with precast or composite deck can be erected and trafficable in a fraction of the time a cast in situ concrete frame requires.
The deck choice is the main commercial decision. A composite steel deck with concrete topping is the cheapest first cost and gives a quiet surface, but it needs a curing period before traffic. Precast hollow core planks on steel beams can be laid and opened to traffic the same week and are preferred on tight urban sites where the contractor cannot wait. We price both and show the programme difference. Edge protection, vehicle barriers and the 1.1 m high perimeter parapet are designed as structural elements on this frame rather than as add ons, because a vehicle barrier takes a 60 kN impact load and bolting one to a cladding rail is not acceptable.
Drainage, lighting and fire strategy shape the layout more than most clients expect. Decks fall at 1.5 percent to a linear channel at each level, with downpipes inside a protected shaft so they do not cross the parking bays. Lighting is LED with presence detection on each level, and the open sided facade gives natural ventilation for smoke clearance, which is why this structure does not need mechanical smoke extract in most jurisdictions. Where the site is tight, a split level layout with short ramps between half floors recovers up to 25 percent more bays on the same footprint, and our engineers will model that against the client's vehicle turning circles before any steel is ordered.
Key Features- 800 vehicle capacity: Five levels on a 6 m grid with three bay parking modules
- Composite or precast deck: Two deck options priced against programme and acoustic preference
- Two way ramps at 1:7: Comfortable gradient with transition curves for low clearance vehicles
- Structural edge barriers: 1.1 m parapet designed for 60 kN vehicle impact, not bolted to cladding
- Natural smoke ventilation: Open facade design removes the need for mechanical extract in most sites
- Split level option: Half floor ramps recover up to 25 percent more bays on a tight footprint
| Parameter | Specification |
|---|---|
| Capacity | 800 vehicles over five levels |
| Grid | 6 m by 16 m typical bay module |
| Deck options | Composite steel deck 120 mm or precast hollow core |
| Vehicle load | 2.5 t design vehicle, 4 kN per square metre uniformly distributed |
| Ramp gradient | 1:7 with transition curves |
| Barrier capacity | 60 kN impact at 1.1 m height |
| Deck fall | 1.5 percent to linear drainage channel |
| Structure | Q355B beams and columns, hot dip galvanized option |
| Fire strategy | Open sided natural ventilation, dry riser provision |
Shopping centre parking, hospital and university car parks, airport and station park and ride, residential development podium parking and corporate campus parking all use this structure. Steel is particularly suitable where the site is constrained and the frame has to be erected with a small crane over live traffic. Where the client intends to add solar canopies on the top deck later, the top level frame carries a 0.3 kN per square metre allowance and the cable routes are built in from the start.
Engineering Notes and Quality ControlCar parks are checked for the things drivers experience. Deck flatness is surveyed to confirm the 1.5 percent fall and to eliminate ponding, ramp transitions are measured against the vehicle profile, and barrier posts are proof loaded on a sample basis. Galvanized coatings on exposed steel are measured at ten points per member because a car park is a wet environment with road salt. Bolt torque is verified on 10 percent of connections per level and recorded by grid line. The handover pack includes as built levels, barrier test records and the maintenance schedule for the coating.
Packaging, Loading and WarrantyBeams and columns ship as marked bundles by level and grid line, decking in pallets sized to one pour, and barrier components crated by elevation with fixings bagged per post. Erection drawings show the ramp sequence and the temporary stability bracing required before decks are fixed. Structural warranty is 10 years, galvanized finish 15 years. Provide your vehicle count, site footprint and traffic entry point and our engineers will return a layout with a bay count study.
Contact Our Experts And Get A Free Consultation!
Our mission is to offer "High Quality" & "Good Service" & "Fast Delivery" to help our clients to gain more profits.