logo
Quality Two Storey Steel Warehouse Building Mezzanine Racking Platform 5000 Sqm Storage Facility factory
<
Quality Two Storey Steel Warehouse Building Mezzanine Racking Platform 5000 Sqm Storage Facility factory
Quality Two Storey Steel Warehouse Building Mezzanine Racking Platform 5000 Sqm Storage Facility factory
>

Two Storey Steel Warehouse Building Mezzanine Racking Platform 5000 Sqm Storage Facility

Product Summary

Land is usually the line item that breaks a warehouse budget, not steel. When a client needs 5000 sqm of storage on a 2500 sqm plot, the answer is a two storey steel warehouse with an intermediate mezzanine that carries racking rather than people. This design puts the mezzanine beams on their own ...

Product Custom Attributes

Total Floor Area::
5000 Sqm Over Two Levels, 2500 Sqm Per Level
Mezzanine Grid::
6 M By 6 M Columns, 200 Mm Secondary Beams
Floor Working Load::
5 KN/m2 Standard, 7.5 KN/m2 Heavy Option
Clear Height::
4.2 M Under Mezzanine, 6 M Above
Primary Steel::
Q355B H Section Columns And Beams
Upper Deck::
1.0 Mm Profiled Deck Plus 120 Mm Concrete
Fire Protection::
90 Minute Intumescent Coating, Columns And Primary Beams
Ramp::
1:8 Gradient, 4 M Wide, Anti Slip Checker Plate
Egress::
Two Protected Stairs, 45 M Maximum Travel Distance
Highlight::

two storey steel warehouse

,

mezzanine storage platform

,

multi level warehouse building

Basic Properties

Place of Origin:
China
Brand Name:
KXD Steel Structure
Certification:
ISO 9001, CE, EN 1090
Model Number:
KXD-WH-MZ50

Trading Properties

Minimum Order Quantity:
300 square meters
Price:
USD 38 - 65 per square meter
Packaging Details:
Naked bundles in containers, panels edge stacked, accessories crated by installation sequence
Delivery Time:
25 - 35 working days after drawing approval
Payment Terms:
T/T 30% deposit, 70% before shipment; L/C at sight
Supply Ability:
8000 tons per month

Product Description

Land is usually the line item that breaks a warehouse budget, not steel. When a client needs 5000 sqm of storage on a 2500 sqm plot, the answer is a two storey steel warehouse with an intermediate mezzanine that carries racking rather than people. This design puts the mezzanine beams on their own column grid inside the main portal, so the upper floor load never travels through the roof frame. KXD Steel Structure separates the two load paths at design stage, which keeps the roof steel light and the floor steel honest.

The structural decision that saves the most money is the mezzanine grid. A 6 m by 6 m column grid with 200 mm deep secondary beams keeps the floor at 5 kN/m2 working load and still leaves 4.2 m clear under the mezzanine for a standard reach truck. If the client wants a fully open upper deck, the beams grow to 400 mm and the cost rises by roughly a quarter. We present both options with span tables so the buyer chooses with numbers rather than guesswork, and we check the vertical circulation, forklift ramp gradient and fire escape travel distance at the same time because those three items usually decide the final layout.

Access is where two storey warehouses succeed or fail in daily operation. This building includes a 1:8 internal ramp with anti slip deck, a dedicated goods lift shaft if the client needs pallet flow between levels, and a 1.2 m high edge protection rail with toe board on the open side of the mezzanine. Column fire protection is specified as intumescent coating rated to 90 minutes for the ground floor columns, while the upper deck uses a composite profiled deck with 120 mm concrete topping for acoustic and fire separation. Every penetration for sprinkler and cable tray is pre cut in our workshop so the site team is not burning holes in a galvanized beam.

Key Features
  • Independent mezzanine grid: Floor loads carried on their own columns, so roof steel stays economical
  • 5 kN/m2 floor capacity: Designed for palletised goods and reach trucks, upgradable to 7.5 kN/m2
  • 1:8 internal vehicle ramp: Anti slip deck and guard rails keep forklift traffic off the external yard
  • 90 minute column fire rating: Intumescent coating on ground floor columns with documented thickness schedule
  • Composite upper deck: Profiled steel deck and 120 mm concrete topping for fire and acoustic separation
  • Pre cut service penetrations: Sprinkler and cable openings formed in the workshop, protecting galvanized coatings
Technical Specifications
ParameterSpecification
Total floor area5000 sqm over two levels, 2500 sqm per level
Mezzanine grid6 m by 6 m columns, 200 mm secondary beams
Floor working load5 kN/m2 standard, 7.5 kN/m2 heavy option
Clear height4.2 m under mezzanine, 6 m above
Primary steelQ355B H section columns and beams
Upper deck1.0 mm profiled deck plus 120 mm concrete
Fire protection90 minute intumescent coating, columns and primary beams
Ramp1:8 gradient, 4 m wide, anti slip checker plate
EgressTwo protected stairs, 45 m maximum travel distance
Applications

Urban distribution centres, spare parts warehouses, e commerce fulfilment hubs and wholesale depots on constrained plots use this layout to double usable floor without buying land. It also fits manufacturers who need raw material storage below and finished goods above on the same site. Where the upper level is used for light assembly rather than storage, we increase the live load and add a resin floor finish so the deck performs as a working floor rather than a racking platform alone.

Engineering Notes and Quality Control

Two storey warehouses fail on connection design more often than on member size. Every beam to column connection is designed for the actual moment, shear and 5 percent eccentricity, and we issue a connection schedule rather than relying on site welding. Deck studs are welded and bend tested on a 5 percent sample. Concrete topping thickness is verified by a survey before handover. Our engineer also reviews the buyer's racking layout, because point loads from racking legs at mid span are a common cause of unacceptable floor vibration in otherwise correctly sized buildings.

Packaging, Loading and Warranty

Columns and mezzanine beams ship as marked bundles, decking in pallets with edge protection, and stairs and rails crated by level. A lifting plan and erection sequence drawing are supplied, and we recommend erecting the mezzanine frame before the roof so the crane can work from inside. Structural warranty is 10 years, with a 2 year finish warranty. Send your plot dimensions, target floor areas and racking loads and our team will return two layout options with steel weight comparison.

Contact Our Experts And Get A Free Consultation!

Our mission is to offer "High Quality" & "Good Service" & "Fast Delivery" to help our clients to gain more profits.