logo
Quality Crane Equipped Steel Structure Workshop Building for Heavy Machinery Assembly Plant factory
<
Quality Crane Equipped Steel Structure Workshop Building for Heavy Machinery Assembly Plant factory
>

Crane Equipped Steel Structure Workshop Building for Heavy Machinery Assembly Plant

Product Summary

A crane equipped steel structure workshop for heavy machinery assembly, engineered with a reinforced frame and overhead crane beam to lift and position large components safely.

Product Custom Attributes

Main Structure::
Reinforced Q355B H-section Frame With Crane Bracket
Crane Capacity::
5 - 50 Ton Overhead Crane
Crane Beam::
Welded Box Section Or H-section Crane Rail
Span Width::
15m - 45m
Eave Height::
6m - 20m
Roof System::
Color Steel Sheet With Insulation Option
Wall System::
Color Steel Sheet Or Sandwich Panel
Design Life::
50 Years
Surface Treatment::
Shot Blasting And Heavy Duty Coating
Column Base::
High Strength Anchor Bolt System
Highlight::

Crane Equipped Steel Workshop

,

Overhead Crane Beam Structure

,

Heavy Machinery Assembly Building

Basic Properties

Place of Origin:
Shandong, China
Brand Name:
JinHongTong
Certification:
CE (EN 1090), ISO 9001:2015
Model Number:
JHT-WS-CR-HM

Trading Properties

Minimum Order Quantity:
500 Square Meters
Price:
USD 28-60 / Square Meter
Packaging Details:
Waterproof plastic film, steel strip bundling and wooden pallets, seaworthy export packing
Delivery Time:
5-8 working days for design, 15-30 days for production
Payment Terms:
T/T, L/C, D/P, Western Union
Supply Ability:
20,000-30,000 Square Meters per Year

Product Description

This crane equipped steel structure workshop is engineered for heavy machinery assembly, where overhead lifting is central to the production process. The columns and crane brackets are reinforced to carry an overhead crane rated from 5 to 50 tons, and the crane beam is fabricated as a welded box or heavy H-section to minimize deflection under load. The wide clear span keeps the assembly floor open so large frames, engines and equipment can be moved and positioned accurately. Because the structure is prefabricated and bolted, the workshop can be erected quickly, then commissioned with the crane system integrated from the start. It is the practical choice for plants that assemble, test and service heavy equipment under one roof.

Key Features
  • Reinforced Crane Frame: Columns and brackets are strengthened to safely support overhead crane loads from 5 to 50 tons with controlled deflection.
  • Precision Crane Beam: The crane rail is fabricated as a welded box or heavy H-section, providing a stable running surface for smooth hoist travel.
  • Wide Assembly Span: Clear spans from 15 to 45 meters allow large components to be lifted, rotated and positioned without obstruction.
  • High Eave Clearance: Eave heights up to 20 meters accommodate tall equipment and full crane travel above the assembly floor.
  • Heavy Duty Coating: A multi layer anti-corrosion coating system withstands the dust, impacts and humidity typical of heavy industry.
  • Robust Foundation Interface: A high strength anchor bolt system transfers crane and equipment loads safely into the concrete foundation.
  • Fast Bolted Erection: Prefabricated members assemble on site without welding, speeding commissioning of the entire production hall.
Technical Specifications
ParameterSpecification
Main FrameReinforced Q355B H-section with crane bracket
Crane Capacity5 - 50 ton overhead crane
Crane BeamWelded box section or H-section crane rail
Span Width15m - 45m
Eave Height6m - 20m
Roof SystemColor steel sheet with insulation option
Wall SystemColor steel sheet or sandwich panel
Surface TreatmentShot blasting + heavy duty coating
Column BaseHigh strength anchor bolt system
Design Life50 years
Seismic Intensity8 degrees
ConnectionFully bolted, no on-site welding
Applications

The workshop is built for heavy machinery assembly plants, steel equipment manufacturing halls, generator and turbine assembly bays, shipyard workshops, mining equipment maintenance shops, precast mold handling areas and large component fabrication facilities. It also suits maintenance and overhaul depots where cranes must lift engines, gearboxes and structural subassemblies during repair. Integrated crane and building design ensures lifting and assembly proceed efficiently within one controlled environment.

Packaging & Quality Assurance

All steel members are protected with waterproof plastic film and steel strip bundling on wooden pallets in a seaworthy export format. Crane beam sections, brackets and high strength bolts are packed in labeled crates with inspection reports. Every frame is checked for weld quality, dimensions and coating before dispatch. The structure carries a 50-year design life, and lifting interfaces are documented so the crane supplier can confirm compatibility during installation.

Contact Our Experts And Get A Free Consultation!

Our mission is to offer "High Quality" & "Good Service" & "Fast Delivery" to help our clients to gain more profits.