logo
Quality Fast Bolt Assembly Steel Warehouse Building Prefabricated Kit Quick Site Installation Africa Distribution factory
<
Quality Fast Bolt Assembly Steel Warehouse Building Prefabricated Kit Quick Site Installation Africa Distribution factory
Quality Fast Bolt Assembly Steel Warehouse Building Prefabricated Kit Quick Site Installation Africa Distribution factory
>

Fast Bolt Assembly Steel Warehouse Building Prefabricated Kit Quick Site Installation Africa Distribution

Product Summary

Bolt-assembled prefabricated steel warehouse kit delivered flat-packed for rapid on-site erection without welding.

Product Custom Attributes

Assembly Method::
Full Bolted, No Site Welding
Erection Time::
1000 Sqm In 15-20 Days
Clear Span::
12m - 36m
Eave Height::
5m - 10m
Main Frame::
Q235B / Q355B H-Section
Connections::
Grade 8.8 / 10.9 High-Strength Bolts
Shipping::
Flat-Packed 40HQ Containers
Foundation::
Anchor Bolt + Concrete Strip
Roof Panel::
EPS / Rock Wool Sandwich Panel
Service Life::
50 Years
Highlight::

Steel warehouse building prefabricated kit

,

Fast bolt assembly warehouse kit

,

Quick site installation steel warehouse

Basic Properties

Place of Origin:
Shandong, China
Brand Name:
Jinhongtong
Certification:
ISO 9001, CE, SGS, AWS D1.1
Model Number:
JHT-SWB-FB30

Trading Properties

Minimum Order Quantity:
1 Set
Price:
USD 30-120 / Square Meter
Packaging Details:
Flat-packed steel members with protective spacers, loaded in 40HQ containers
Delivery Time:
20-35 days after deposit
Payment Terms:
T/T, L/C, Western Union
Supply Ability:
5000 Tons per Month

Product Description

Jinhongtong Group presents the JHT-SWB-FB30, a Bolt-assembled prefabricated steel warehouse kit delivered flat-packed for rapid on-site erection without welding. Engineered with high-strength steel and manufactured under strict ISO 9001 quality control, this building combines structural reliability, fast construction and long service life, making it a preferred choice for Africa distribution buyers worldwide.

Key Features
  • Zero Site Welding: JHT-SWB-FB30 uses a fully bolted connection system; unskilled local labor can complete assembly with simple tools across Africa distribution.
  • Rapid Erection: A 1000 sqm warehouse can be erected in 15-20 days with a crew of 8-10 workers, saving months versus cast-in-place construction.
  • Flat-Pack Container Shipping: Components are flat-packed into 40HQ containers, reducing freight volume by up to 40 percent.
  • Factory Precision: CNC drilling and shot blasting at the factory guarantee hole alignment and coating quality before shipment.
  • Minimal Site Works: Only anchor bolt installation and concrete strip footings are required, eliminating heavy formwork and curing time.
  • Complete Erection Manual: Step-by-step erection drawings, bolt torque tables and an on-site supervisor option ensure error-free assembly.
Technical Specifications
ParameterSpecification
Assembly MethodFull Bolted, No Site Welding
Erection Time1000 sqm in 15-20 Days
Clear Span12m - 36m
Eave Height5m - 10m
Main FrameQ235B / Q355B H-Section
ConnectionsGrade 8.8 / 10.9 High-Strength Bolts
ShippingFlat-Packed 40HQ Containers
FoundationAnchor Bolt + Concrete Strip
Roof PanelEPS / Rock Wool Sandwich Panel
Service Life50 Years
Applications

Typical applications include agricultural storage sheds, mining camp facilities, retail warehouses, manufacturing plants and disaster-relief storage buildings where speed of construction is critical. The bolted system allows parallel work streams: while the foundation is curing, frames can be pre-assembled on the ground.

For African clients, flat-pack container shipping and simple erection procedures reduce reliance on specialized equipment and skilled welders, allowing local crews to complete assembly quickly with supervision from our engineers.

Manufacturing Quality

Jinhongtong operates 170 sets of advanced fabrication equipment, including large hydraulic press brakes, CNC drilling machines, large-scale shot blasting units and ultrasonic flaw detectors. Processing follows AISC 360, Eurocode 3 and EN 1090 standards, with strict raw material inspection, precision CNC cutting, professional submerged arc welding, and full visual and UT/MT non-destructive testing before delivery. This disciplined process ensures every member arrives on site with exact dimensions and flawless coating.

Packaging & Quality Assurance

Components are numbered and color-coded against the erection drawings, and bolt kits are pre-packaged by connection type to eliminate confusion on site. Flat-pack loading into 40HQ containers maximizes container utilization and minimizes freight cost.

The delivery package includes a full erection manual with step-by-step illustrations, torque tables and a checklist. An optional on-site supervisor can be arranged, and all structures carry a 10-year warranty.

Contact Our Experts And Get A Free Consultation!

Our mission is to offer "High Quality" & "Good Service" & "Fast Delivery" to help our clients to gain more profits.